
Add to Cart
Product Description
Once the contract has been awarded, the supplier is expected to submit a concept clearly showing design intent of the fixture to be evaluated by the APQP team. The customer and Kirchhoff Automotive part numbers, revision level and date, and CAD file used should be included in the design.
The vendor is required to complete the design and submit to Kirchhoff Automotive for approval. Final approval must be obtained prior to commencement of construction of the fixture.
An updated design and a CMM certification must be available at the fixture buy off and passed to Quality representative. Fixture is to be delivered to destination specified in PO. Checking Fixture cannot be delivered before buy-off is completed and authorization to ship is provided by Kirchhoff Automotive Quality representative.
Our production detail
Items | ||
1 | Base Material | Al |
2 | Application | Stamping Parts |
3 | Surface treatment | Oxidation/Paint |
4 | Processing Precision | 0.15 |
5 | Accuracy for Other Profiles | 0.1 |
6 | Accuracy for Datum Hole | ±0.05 |
7 | Certificate | ISO 9001:2008 |
8 | CMM certification | Yes |
9 | Software | Catia, UG, CAD, STP |
10 | Specification | 430*300*260mm |
11 | Packing | Wooden Box |
Quality Control
CMM (3D Coordinate Measuring Machine), Vms-2515G 2D Projector, HR-150 A Hardness Tester
Third Party Certification done by ShenZhen Silver Basis Testing Technology Co., Ltd , ISO17025 Certified
Lead time & Packing
35 days after 3D design approved
7 days via express: FedEx
Standard Export Wooden Case
Primary Competitive Advantages
Pursuit Of Quality Excellence
Multiple Products & Services
Efficiency Consciousness-On-Time Delivery
Cost Consciousness-Innovative Design Solutions To Reduce The Cost
Timely Communication With Our Customer
Compliance With Cooperator’s Terms And Conditions
NDA(Non-disclosure Agreement)
Our purpose is that we can only succeed if our customers succeed.