
Add to Cart
Acceptance and Buy Off
1. Buy off procedure
2. Operator manual
3. T&F Gauges (feasibility acc. VDA or ISO9000)
R&R study
4. Buy off document
5. Buy Off process (CMM + CAD)
The intent of a Checking device is to control both the quality of a produced part
and the process capability of its tool.
This Generic Build Specification is to specify Ford‘s requirements for all end
customer appearance related parts/assemblies and guide each supplier of a
component to fulfill this demands.
This specification will support our suppliers to control their quality and costs related to the fixture build.
All mentioned requirements inherent this specification are the minimum
requirements to build a checking fixture according Ford‘s expectation on
part quality.
Our production detail
Items | ||
1 | Base Material | Al |
2 | Application | Plastic Parts |
3 | Surface treatment | Oxidation/Paint |
4 | Processing Precision | 0.15 |
5 | Accuracy for Other Profiles | 0.1 |
6 | Accuracy for Datum Hole | ±0.05 |
7 | Certificate | ISO 9001:2008 |
8 | CMM certification | Yes |
9 | Software | Catia, UG, CAD, STP |
10 | Specification | 1000*300*380mm |
11 | Packing | Wooden Box |
Quality Control
CMM (3D Coordinate Measuring Machine), Vms-2515G 2D Projector, HR-150 A Hardness Tester
Third Party Certification done by ShenZhen Silver Basis Testing Technology Co., Ltd , ISO17025 Certified
Lead time & Packing
35 days after 3D design approved
7 days via express: FedEx
Standard Export Wooden Case
Primary Competitive Advantages
Pursuit Of Quality Excellence
Multiple Products & Services
Efficiency Consciousness-On-Time Delivery
Cost Consciousness-Innovative Design Solutions To Reduce The Cost
Timely Communication With Our Customer
Compliance With Cooperator’s Terms And Conditions
NDA(Non-disclosure Agreement)
Our purpose is that we can only succeed if our customers succeed.