
Add to Cart
Product Description
Checklist Recommended Timing: One month before <VP>
1.Verify that the gauge is complete as CMM holding fixture and the datum system is complete per the approved gauge design or drawing. See Figure 13.
2.Verify that there is no interference when a part is loaded and unloaded from the gauge.
3.Verify that the operator instructions and sequence of operations on the use of gauge are secured to the gauge.
4.Verify that the gauge is certified as CMM holding fixture.
5.Verify that the either Gauge Repeatability (using CMM, 2 points min in each X,Y,Z axis) or GR&R (using variable ports - if applicable) is complete.
Our production detail
Items | ||
1 | Base Material | Al |
2 | Application | Plastic Parts |
3 | Surface treatment | Oxidation |
4 | Processing Precision | 0.15 |
5 | Accuracy for Other Profiles | 0.1 |
6 | Accuracy for Datum Hole | ±0.05 |
7 | Certificate | ISO 9001:2008 |
8 | CMM certification | Yes |
9 | Software | Catia, UG, CAD, STP |
10 | Specification | 380*380*200 mm |
11 | Packing | Wooden Box |
Manufacturing tolerance:
1.The Flatness of Base Plate 0.05/1000
2.The Thickness of Base Plate ±0.03mm
3.The Location Datum ±0.02mm
4.The Surface ±0.1mm
5.The Checking Pins and Holes ±0.1mm
Process
CNC Machining(Milling/Turning), Grinding
Electroplating Chromium Treatment
Quality Control
CMM (3D Coordinate Measuring Machine), Vms-2515G 2D Projector, HR-150 A Hardness Tester
Third Party Certification done by ShenZhen Silver Basis Testing Technology Co., Ltd , ISO17025 Certified
Lead time & Packing
35 days after 3D design approved
7 days via express: FedEx
Standard Export Wooden Case
Primary Competitive Advantages
Pursuit Of Quality Excellence
Multiple Products & Services
Efficiency Consciousness-On-Time Delivery
Cost Consciousness-Innovative Design Solutions To Reduce The Cost
Timely Communication With Our Customer
Compliance With Cooperator’s Terms And Conditions
NDA(Non-disclosure Agreement)
Our purpose is that we can only succeed if our customers succeed.