
Add to Cart
Product Description
We will maintain the change columns of both the fixture design and the fixture. The change column shall reflect the latest production design level whether the fixture has been affected or not.
we are expected to resolve design problems in a timely manner and for immediate notification that a problem exists. Any revision that changes the original fixture cost must be approved by the customer Program Manager.
we will manage and meet the agreed on timing for concept, final design, R&R, certification and final approval. Timing updates will be provided to the Quality Engineer as requested. Any slips in timing must be communicated to the Quality Engineer.
Our production detail
Items | ||
1 | Base Material | Al |
2 | Application | Stamping Parts |
3 | Surface treatment | Oxidation |
4 | Processing Precision | 0.15 |
5 | Accuracy for Other Profiles | 0.1 |
6 | Accuracy for Datum Hole | ±0.05 |
7 | Certificate | ISO 9001:2008 |
8 | CMM certification | Yes |
9 | Software | Catia, UG, CAD, STP |
10 | Specification | 520*430*280mm |
11 | Packing | Wooden Box |
Quality Control
CMM (3D Coordinate Measuring Machine), Vms-2515G 2D Projector, HR-150 A Hardness Tester
Third Party Certification done by ShenZhen Silver Basis Testing Technology Co., Ltd , ISO17025 Certified
Lead time & Packing
35 days after 3D design approved
7 days via express: FedEx
Standard Export Wooden Case
Primary Competitive Advantages
Pursuit Of Quality Excellence
Multiple Products & Services
Efficiency Consciousness-On-Time Delivery
Cost Consciousness-Innovative Design Solutions To Reduce The Cost
Timely Communication With Our Customer
Compliance With Cooperator’s Terms And Conditions
NDA(Non-disclosure Agreement)
Our purpose is that we can only succeed if our customers succeed.